It’s finally starting soon™
The long-awaited Project: [REDACTED] has transitioned from the drawing board to reality. The countdown has begun, with a launch window ranging from a few hours to a maximum of 72. However, there’s a checklist of preliminary tasks to tackle before diving into the heart of Project: [REDACTED]. It’s a race against time, but the groundwork laid during the planning phase promises a smooth takeoff into the project’s execution stage.
Preliminary tasks:
- Rearrange the master bedroom’s furniture and electronics
- “SOC & NOC” Center needs a little bit of “dusting”
- Surface cleaning
- Stacking the “unstackables”
- Reroute couple RJ45’s
- Placing another crib
Once those tasks are completed, I will proceed upstairs to work on a Project: [REDACTED]:
- Surface cleaning
- AC wiring
- Stacking w/ Green Screen Magic
- Surface sweep
- Installing Software & Hardware
- Profit?
Important changes:
Info:
I’m attempting to return to my usual night-owl routine as soon as possible.
This project will result in a partial step back in my streaming progress. It will directly influence the way I conduct Night-owl streams for now.
- Goodbye 17″ screen and a gamepad. Welcome back a 7″ tablet (RDP over Wi-Fi) & touchscreen controls. Streaming/Gaming is really difficult on a tablet lying in bed
- Microphone’s off (baby on a crib)
- Chat is disabled for WpE’s view cos of reasons™